Improvement bypass to the executive plan of composite steel-concrete deck of the Barragiones viaduct
Structural tipology:
Beam Bridge

Design level:
Executive plan


Location

Circonvallazione di Cuglieri (OR) – bypass to S.S. 292

Principal

PREVE Costruzioni S.p.A

Contracting company

PREVE Costruzioni S.p.A

Team

Matildi+Partners srl

Activities

Executive plan (scaffolding)

Time Period

2014-2017

Extent and spans

208 m

64+80+64

 

Barragiones Viaduct

Structural Layout

Structural Layout

Structural Layout

Improvement bypass to the executive plan of composite steel-concrete deck of the Barragiones viaduct.

The new deck is a continuous truss in a composite steel-concrete system with a twin beam truss layout with three spans of 64+80+64 m

Deck and Launch

Deck and Launch

Deck and Launch

The concrete slab accommodates the road platform for a total width of 12.00 m; it is frame worked on the main beams, which are 7.5 m apart, and has a constant thickness of 28 cm.

The beams have a constant height of 3.70 m and are connected by diaphragms with a lattice section placed at a variable pitch of 5.5 m to 6.0 m, as well as by an upper bracing with a St. Andrew’s cross pattern and a lower bracing plane with a rhomboid pattern, which guarantees torsion-rigid box functionality.

The viaduct was launched head-on without the use of starlings.